free site templates


PREVIOUS PROJECTS

2003 CCSA Dammam : Rebuild and restart and adapt line to manufacture multiple sizes and diameters.
2004 Line 3 JBCMC Install new high speed line.
2004 CCMC South Corniche Jeddah KSA: Turnkey Project 60,000M² factory stand alone in South Corniche Jeddah two high speed steel lines.
2005 Nafcel Jeddah: Reconfigure end lines.
2007  Crown Emirates Duabi : Line upgrade and speed increase. 
2007 Crown Jordan: Bodymaker rebuilds. Line 3 wiring.
2008 MEPAC Baghdad Iraq: 65,000M² factory Zafaraniyah Baghdad two 3000c.p.m lines.
2008 Rexam Berlin: Change over to aluminium. Technical support.
2009 Seville Spain: Line 2 installation. High speed steel two piece beverage Can.
2010 Rongzin China: New two piece can line high speed.
2011 Pepsi Dubai: Engineering and drawing package for relocation.
2011 Banghi Thailand: Technical Support.
2011 Crown Vietnam, Malaysia, Cambodia: Technical Support.
2012 Al Jomaih Riyadh KSA: Manufacture and install Kevlar oven upgrades for inside bake ovens.
2012 : Rexam Mexico: Conveyor installations. New high speed line.
2103: Crown Slovakia: Line 1 upgrade decorator, pin oven and install conveyors.
2013 Crown Food Can: Factory Relocation Aintree Liverpool.
2013 Sulzer/ Balfour Beatty: Factory relocation.
2014: Rexam Finland: Technical assistance.
2015: Nigeria: Technical Assistance GZI and Nampak
2015: Nampak South Africa: Technical assistance,
2016 Nampak South Africa and Angola: Technical assistance.
2016: CMB Burlington USA: Technical assistance.
2016: Crabtrees Gateshead: Installation Cairo.